India - Urban Slums Survey, July - December 2002, NSS 58th Round
Reference ID | DDI-IND-MOSPI-NSSO-58Rnd-Sch-0dot21-2002 |
Year | 2002 |
Country | India |
Producer(s) | National Sample Survey Office - M/o Statistcs and Programme Implementation(MOSPI),Government of India (GOI) |
Sponsor(s) | M/o Statistics & Programme Implementation, GOI - MOSPI - |
Collection(s) |
Created on
Jan 17, 2018
Last modified
Mar 27, 2019
Page views
46318
Data Collection
Data Collection Dates
Start | End | Cycle |
---|---|---|
2002-07-01 | 2002-09-30 | N/A |
2002-10-01 | 2002-12-31 | N/A |
Data Collection Mode
Focus Group [foc]
Data Collection Notes
The entire survey period (1st July 2002 - 31st December 2002) was divided into two sub-rounds of three months’ duration each
(Sub-round 1: July-September 2002, Sub -round 2: October-December 2002) and an equal number of sample blocks were allocated to each sub-round. Each FSU was surveyed during the sub-round period to which it was allocated. Within a particular sub-round, the field-work was spread out uniformly over the different months to the extent possible.Unlike household surveys where data are collected from a member of each household selected for the survey, data were collected in this survey for the entire slum from knowledgeable persons as judged by survey officials.
Questionnaires
Schedule 0.21 consists of 6 blocks. The blocks are:
Block 0: descriptive identification of sample FSU (Urban)
Block 1: identification of sample FSU (Urban)
Block 2: particulars of field operations
Block 3: particulars about the slum
Block 4: change in the condition of the slum during the last 5 years
Block 5: remarks by investigator/senior investigator
Block 6: comments by supervisory officers.
Data Collectors
Name | Abbreviation | Affiliation |
---|---|---|
Field Operations Division of Naional Sample Survey Office | NSSO(FOD) | Ministry of Statistics and Programme Implementation |