India - Service Sector in India 2006-07, NSS 63rd round
Reference ID | IND-NSSO-SSI-2006-v1.0 |
Year | 2006 - 2007 |
Country | India |
Producer(s) | NSSO - Ministry of Statistics and Programme Implimentation, Government of India (GOI) |
Sponsor(s) | Ministry of Statiistics and Program Implimentation - MOSPI, Government of India - |
Collection(s) |
Created on
Jan 18, 2018
Last modified
Mar 27, 2019
Page views
172992
Ent. Type during the ref. year
(B2_228)
File: bk_2_1
File: bk_2_1
Overview
Type:
Discrete Format: numeric Width: 1 Decimals: 0 Range: 1-2 | Valid cases: 0 Invalid: 0 |
Questions and instructions
Value | Category |
---|---|
1 | Own Account Enterprise |
2 | Establishment |
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Item 228: enterprise type during the reference year: The actual enterprise type on the basis of total number of workers and number of hired workers normally worked during the reference year will be recorded here. If the enterprise normally ran without any hired worker during the reference year (irrespective of whether it had hired workers during the reference month or not) it will be considered as an OAE and the code will be '1'. If it normally ran with 1 or more hired workers, it will be considered as establishment and the code will be '2'.
- There is a possibility of finding at this stage that the enterprise type found now differs from the one recorded during the listing stage (e.g., an enterprise is actually an establishment although it was listed as a OAE). In such cases, no change/adjustment in any of the two schedules will be made. This change is not required even if all enterprises of a village/UFS block are surveyed.
- There is a possibility of finding at this stage that the enterprise type found now differs from the one recorded during the listing stage (e.g., an enterprise is actually an establishment although it was listed as a OAE). In such cases, no change/adjustment in any of the two schedules will be made. This change is not required even if all enterprises of a village/UFS block are surveyed.