Logo

An Online Microdata Library

Logo
  • Home
  • Policies and Guidelines
  • Download Manual
  • Contact Us
  • Login
    Login
    Home / Central Data Catalog / DDI-IND-MOSPI-NSSO-49RND-SCH1DOT2-1993 / variable [F13]
central

Housing Condition and Migration Survey, January - June 1993
NSS 49th Round

India, 1993
Get Microdata
Reference ID
DDI-IND-MOSPI-NSSO-49Rnd-Sch1dot2-1993
Producer(s)
National Sample Survey Office
Collections
Other Surveys
Metadata
DDI/XML JSON
Created on
Jan 17, 2018
Last modified
Mar 27, 2019
Page views
204437
Downloads
6314
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Block-3-Part-1-household
    characteristics
    records
  • Block-3-Part-2-Persons--Particulars
    of past members
    outside-records
  • Block-4-Persons-Demographic
    and migration
    particulars-records
  • Block-5-Building
    and environment
    particulars-
    Records
  • Block-6-Particulars
    of
    dwelling-Records
  • Block-7-Particulars
    of living
    facilities-Records
  • Block-8-Part-1--Particulars
    of building
    construction
    for residential
    purpose-Records
  • Block-9-Particulars
    of
    dwelling-land
    owned
    elsewhere-Records
  • Block-10-Use of
    public
    distribution
    system-Records
  • Block-11-General
    particulars of
    slum
    dwellers-Records
  • Block-8-Part-3--Particulars
    of building
    construction
    for residential
    purpose-Records
  • Block-8-Part-2--Particulars
    of building
    construction
    for residential
    purpose-Records

Material cost -Bldg compltd (B8_q11a)

Data file: Block-8-Part-3--Particulars of building construction for residential purpose-Records

Overview

Valid: 7484
Invalid: 0
Minimum: 0
Maximum: 350000
Mean: 9324.365
Standard deviation: 25510.72
Type: Continuous
Decimal: 0
Start: 92
End: 97
Width: 6
Range: 0 - 350000
Format: Numeric

Questions and instructions

Literal question
cost of construction of building completed during last year (Rs)-Material
Interviewer instructions
This item will be filled in for all those building constructions which were completed during last year irrespective of whether the construction had begun during the 5 year reference period or prior to the beginning of the reference period. Total cost incurred for the completed building will be recorded with the bread down - (a) material, (b) labour and (c) others as defined above. Total will be given against (d).
Back to Catalog
Disclaimer
Ministry of Statistics & Programme Implementation (MoSPI) disclaims any liability or responsibility arising from the use of the Microdata Portal - https://microdata[dot]gov[dot]in or the contents of the portal. The Ministry and its staff, individually and collectively, shall not be liable for any financial or other consequences whatsoever arising from the use of the content of the portal, including the inappropriate, improper, or fraudulent use of such content.

MoSPI Website eSankhyiki Website Disclaimer

facebook X YouTube Instagram

Powered by NADA 5.4